• Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Home
  • About
  • Videos & Tutorials
  • White Papers
  • System Brochures
  • News
  • Contact
LinkedIn Twitter YouTube

Industrial Microwave Systems

Request a Call
  • Microwave Systems
    • Small Batch Tempering – MIP 4
    • Tempering Tunnel System – MIP 8
    • Microwave Heating & Drying – MIP 9
    • Batch Tempering Processor – MIP 10
    • Industrial Bacon Cooking Line – MIP 11
    • Continuous Tempering Tunnel – MIP 12
    • 915 MHz Microwave Generators
  • Microwave Generators
    • 75kW Microwave Generator – FMT75
    • 75kW Microwave Generator – GET2024
    • 100kW Microwave Generator – FMT100
    • 100kW Microwave Generator – GET2024
  • Microwave Circulators
    • 75kW, 915 MHz Microwave Circulator
    • 100kW, 915 MHz Microwave Circulator
    • Rebuilds
  • Applications and Markets
    • Boost Heating
    • Bacon Cooking
    • Batch Processing
    • Microwave Drying
    • Industrial Processing
    • Tempering and Defrosting
    • Advanced Microwave R&D
  • Support
    • Circulator Rebuilds
    • Replacement Parts
    • Microwave Circulators
    • Magnetron Tubes & Rebuilds
    • Service: Maintenance & Repair
    • Upgrades: System & Generators
  • Resources & Blog
  • About

MIP 10 Batch Tempering Operation

November 3, 2020

This video shows you basic loading and operating procedure for the 915 MHz, 75 kW MIP 10 Batch Tempering System.

The MIP10 Batch Tempering system enables precise batch tempering of up to 4,000 lbs. (1,816 kg) of frozen product to 28 degree Fahrenheit (-2 Celsius) per shift. Typically, this microwave oven tempers a load of about 300 lbs. (136 kg) in four minutes.

The basic MIP 10 Batch Tempering System consists of a 50-inch by 42-inch (1.3 meter by 1.1 meter) microwave oven, one 75 kilowatt microwave generator and a loading table on convenient rollers. The oven size permits a uniform loading procedure for the simultaneous processing of one 10-inch high (254 millimeter) tier of containers from a 40-inch by 48-inch (1.02 meter by 1.22 meter) pallet.

Typical time (min) required to temper 300 pound loads in 75 kW unit from Zero degrees (-18 Degrees Celsius) starting temperature.

Contact Us

  • This field is for validation purposes and should be left unchanged.
  • Resources
  • Types of Systems
  • News
  • About
  • Contact Us

Contact Us

  • This field is for validation purposes and should be left unchanged.
Copyright © 2026 Industrial Microwave Systems
  • Privacy Policy
Developed by Overlock Design Co.
Microwave Techniques is proudly hosting the IMPI Fall Seminar
Nashua, NH
September 15–17, 2026
Join us for the IMPI Fall Seminar
Register Now →